One batch. One record.

Each production run gets an ID that does not change, the mix revision that was approved, and the materials that actually went in.

VexRoute Desk · Batches

B-DEMO-014

Open
Product
140mm hollow block
Machine
Block machine 1
Shift
Day
Started
06:12
04 · First-off inspectionPass
05 · In-process inspectionPass
05 · In-process inspectionFail → NCR-0032

What it does

  • A batch ID that stays put

    The ID is the handle for inspections, samples, and nonconformances. Later edits do not rename the run.

  • The mix revision that applied

    Target quantities come from the approved mix. The record shows which revision the plant used.

  • Target against actual

    Cement, aggregate, and water are entered against the target. A deviation needs an authorisation, not a quiet overwrite.

  • Tied to product and machine

    The batch knows the product, the machine, and the shift. Retrieval starts from any of those.

Open a batch the way the plant already does.

We will use your product and mix sheet, not a generic concrete example.