Close the failure. Keep it closed.
A failed check opens an issue. Work stays on hold until someone authorised records the disposition and signs it.
Issues · ISS-0032
ISS-0032
HoldOpened automatically — height failed on first-off, batch B-DEMO-014.
- Source
- Form 04 · First-off
- Containment
- Batch on hold
- Raised by
- Field worker, Line 1
- Disposition
- Pending site manager review
What it does
Opened from the check
The issue points at the inspection and the field that failed. Nobody retypes the defect into a second book.
Hold until release
Work stays held until an authorised role records a disposition. The desk does not release it on its own.
Disposition on the record
Rework, repair, or concession is written down with the reason. The history is appended, not replaced.
Who closed it, and when
Closure needs a person and a time. An open item stays visible on the site manager's desk.
See a failed check become a hold.
Fail a check in the demo and follow the issue through to a signed disposition.
Or write to menachem@vexroute.com.

