Skip to content

Close the failure. Keep it closed.

A failed check opens an issue. Work stays on hold until someone authorised records the disposition and signs it.

Issues · ISS-0032

ISS-0032

Hold

Opened automatically — height failed on first-off, batch B-DEMO-014.

Source
Form 04 · First-off
Containment
Batch on hold
Raised by
Field worker, Line 1
Disposition
Pending site manager review

What it does

  • Opened from the check

    The issue points at the inspection and the field that failed. Nobody retypes the defect into a second book.

  • Hold until release

    Work stays held until an authorised role records a disposition. The desk does not release it on its own.

  • Disposition on the record

    Rework, repair, or concession is written down with the reason. The history is appended, not replaced.

  • Who closed it, and when

    Closure needs a person and a time. An open item stays visible on the site manager's desk.

See a failed check become a hold.

Fail a check in the demo and follow the issue through to a signed disposition.

Or write to menachem@vexroute.com.