Block lines.
Hollow and solid block runs use the same desk: start-up, in-process checks, and a batch you can open again by product and date.
VexRoute Desk · Batches
B-DEMO-014
Open- Product
- 140mm hollow block
- Machine
- Block machine 1
- Shift
- Day
- Started
- 06:12
04 · First-off inspectionPass
05 · In-process inspectionPass
05 · In-process inspectionFail → NCR-0032
What it does
Start-up before the first block
Machine, mould, and measuring-equipment checks are signed before production when you configure them that way.
In-process dimensions and appearance
Checks run against the block class on the line. A failure asks for a photo.
A hold when the check fails
The batch stays held until a disposition is signed. The line can see that it is held.
Retrieve by product and date
Last month’s class is a search, not a cabinet. Inspections and any nonconformance come with it.
Walk a block run from start-up to hold.
The demo uses a block line so the batch, the check, and the nonconformance are the same story.
Or write to menachem@vexroute.com.

