Skip to content

Block lines.

Hollow and solid block runs use the same desk: start-up, in-process checks, and a batch you can open again by product and date.

VexRoute Desk · Batches

B-DEMO-014

Open
Product
140mm hollow block
Machine
Block machine 1
Shift
Day
Started
06:12
04 · First-off inspectionPass
05 · In-process inspectionPass
05 · In-process inspectionFail → NCR-0032

What it does

  • Start-up before the first block

    Machine, mould, and measuring-equipment checks are signed before production when you configure them that way.

  • In-process dimensions and appearance

    Checks run against the block class on the line. A failure asks for a photo.

  • A hold when the check fails

    The batch stays held until a disposition is signed. The line can see that it is held.

  • Retrieve by product and date

    Last month’s class is a search, not a cabinet. Inspections and any nonconformance come with it.

Walk a block run from start-up to hold.

The demo uses a block line so the batch, the check, and the nonconformance are the same story.

Or write to menachem@vexroute.com.